Before a dry bulk truck blower enters service, the blower, PTO, driveline and air system should be checked as a complete installation. A problem with any one of these components can affect operation and, where rotating equipment is involved, create a serious safety hazard.
Paragon’s pre-operation procedure for the P858, P858e and P1057 provides a structured process for checking the system before operation, including PTO and driveline verification, blower and air-system inspection, initial rotation, loaded testing and a final safety inspection.
The P858, P858e & P1057 Blower Safety Precautions and Pre-Operation Safety Checklist provides a field-ready document for recording truck and blower information and completing the required checks before the system enters service.